Domestic case study 2

Home » Case Studies » Domestic case study 2

A very good associate of ours contacted us to provide a project proposal for a very high-end new build property, which was to be across 4 floors,

The client did not want to employ a main contractor to over see the day to day running of the project which meant all trades would have to co-ordinate with each other to ensure the project ran smoothly from the 1st fix stage to hand over.

This involved a lot of planning/programming at all stages, something we are used to carrying out across all projects we complete.

The project was to be a complete poured concrete construction, which would allow the roof to be put on at a very early stage and enable all trades to carry out 1st fix whilst the external brickwork façade could be erected.

The cable installation method was also non-standard for a domestic dwelling, cables supported on metallic trunking, again something we could draw on our knowledge from the commercial/industrial side of our operation.

Working closely along side other trades enabled our staff to gain more of an insight into the level of detail and consideration that is needed when forward planning a project and how to accommodate/work alongside other trades and contractors.

We were tasked with the complete design, installation and commissioning of the project, including specifying all accessories and light fittings to work well with the interior design that had been carried out as per the clients wish list.

The bespoke lighting control system installed gives the client full control of their lighting system and compliments the interior and exterior of the property extremely well and can be very easily tweaked from a remote location to satisfy any alterations that may be required.

A full audio-visual system was installed. We were commissioned to install all necessary cabling for this, again working well along side the audio-visual contractor to deliver this seamlessly.

This resulted in a very high end finish throughout which worked extremely well with the interior design that has been executed.

The project was completed within 6 months, which allowed the client to complete the sale of their property and move in as per their wishes.